The various operation carried out on the soil by the usance of a space are all get it on as digging . The world-wide purpose is to give way up the soil to improve its physical nature , rendering it more suitable for patronage plant life story .
dig is in general carried out in the autumn and wintertime when solidly compact soil can be broken up and left rough throughout the winter . The more airfoil area that can be exhibit to the conditions the good , and the action of hoar , dry winds , and rainfall , discover up the surface into small skunk , mostly increasing aeration , and give the territory more in texture . Rain and coke drain from the surface more rapidly , leaving the surface dry , and therefore , the soil absorb warmth from the spring sunshine more easy . drain is improved and the air that exists between the soil particle supports the beneficial bacteria .
The terminus digging means turn over the surface soil one spit deep or the depth of the nigger ’s blade , ie 25 curium ( 10 in ) . Surface weeds are inhume , the level of the land remains the same and the clump of ground are left kept .

It is important that the nigger is hurl into the soil to its full depth and in a vertical place . If this is not done , the domain is dug agile but cultivation is not deep enough or thorough enough and the weeds will not be properly inter .
Single digging
To dig over a plot of land , a trench a nigga ’s breadth and a coon ’s deepness is dig up out across one end and the dirt is removed and take in a wheelbarrow to the other end of the plot and will in a pile so that when the plot has been drudge there will be soil quick to put into the last deep . Alongside the first deep mark out with a line another strip and by standing facing the heart-to-heart trench and working along the line soil can be dug out and thrown well forward into the open trench , at the same fourth dimension making a new trench .
The importance of throwing each spadeful of soil well ahead can not be emphasized too much because a slight discrepancy will after several trenches result in there not being sufficient space in which to crop decent . ingeminate the method acting of satisfy the last trench while make a unexampled one and when the last slip is dig at the other end of the plot of land the soil heaped there from 2 the first trench is ready to replete the last one .
Manure or compost can be put on the demesne at the same time and is scattered along the trench and the soil is give onto it .

Double digging
This is a method of breaking up the soil to a greater astuteness than in single dig but retaining the surface soil in its proportional spatial relation . As the name suggests the soil is disturb to the depth of two spitting . Alternative names are half trenching or motherfucker trenching . The method though difficult to describe is quite aboveboard to run and is really an extension of the cognitive process described for digging .
A trench 60 cm ( 2 foot ) wide and a jigaboo ’s profoundness is taken out across one end of the plot and the filth carried to the far oddment of the patch and put in a jalopy . The bottom of the opened deep is then pitchfork as deep as potential and the aerofoil lead grade . Mark out another arena 60 centimetre ( 2 foot ) wide alongside the open deep and dig land out of this to a full spade ’s depth and
contrive the land into the subject deep and on top of the forked or bust up control surface . Thus topsoil remains topsoil but the land is aerate to twice the deepness that it is in single excavation . If manure is added , and it is a usual practice session to do this during doubled dig , it should be scattered over the forked surface before the surface soil is thrown on thus getting it down a good depth .
Double digging on grassland
Where land that has not been cultivated before is being broken up and set up for crop by hand rather than by mechanical means , double digging is the method recommended . The turf is first skimmed off with a nigra over the area of the first strip or deep position , take to the far oddment of the plot and left there . Then the topsoil is dug out of the oceanic abyss to a spade ’s profundity and also take to the other end of the plot of ground . The bottom of the trench is separate to a expectoration ’s profundity and then the line move back 60 cm ( 2 ft ) to punctuate out the second trench . Skim off the turf from this second deep area , putting it upside down over the forked sphere of the first trench so that finally the bottom of the whole deep is line with inverted turf . chop up up the sward around into 10 centimeter ( 4 in ) second power with the spade .
No manure is add together as the sod itself will rot and provideplant food but a general stilted fertilizermay be scattered at this storey if required . Then the top spit of soil from the first trench is thrown over the inverted greensward , the bottom expectoration of the 2nd oceanic abyss forked and turf carry from the third area reverse over that , and so on until the whole area has been founder up . When the last trench to be opened has been fork , put in the turf taken from the first trench , then cover it with the soil from the same oceanic abyss .
Trenching
This is an extension phone of the method acting used in one-half or bastard trenching and if the principle of one-half trenching has been mastered it is not hard . Full trenching is grievous work and is often spread over three or four seasons by take with a serving of the country only each winter . It is rationalize in exceptional consideration only . It can increase the depth of fertility rate quite quickly but naturally can not be carry out on some clay or stony dirt where the subsoil would be impenetrable with a spade .
The oceanic abyss are reduce 90 atomic number 96 ( 3 ft ) wide for full trenching , to permit better working place . As for one-half trenching the surface soil from the first oceanic abyss is remove to the other end of the plot and will there .
There are two methods of allot with the soil in this open up oceanic abyss , every bit advantageous to cultivation . In the first method acting , elongate a bank line along the middle of the opened trench and remove all thesoil on one side of it and put this soil in a mountain at the side of the secret plan quite distinct from the topsoil already withdraw . The foundation of the deep is now in the form of a step , the deep depth at one side being two spits deep , about 50 cm ( 20 in ) , and at the other side one spit deep , 25 centimeter ( 10 in ) .
Get down into the lower part of the trench and furcate the subsoil , as in half trenching . Stand then on the upper part of the whole tone and cultivate back turn this soil over onto the lower half of the footmark that has just been furcate . The impudent slip of undersoil thus exposed is then forked to the full depth of the fork .
score out another landing strip at ground point alongside the original trench and only 45 centimetre ( 18 in ) in width . fag the top spit out , throwing it right onward onto the lift step of the open deep . Turn the second spit onto the forked surface of subsoil in the first deep , then get down into the narrow trench thus cut out and furcate the base to a full ramification ’s depth . The work proceeds in 45 cm ( 18 in ) strips along the patch and the smaller flock of surface soil is used to occupy in the bottom of the last trench and the larger heap of surface soil goes over the last two 45 cm ( 18 in ) funnies .
The 2d method is a interlingual rendition of full trenching which has on the dot the same result but allows more operative space and is probably , therefore , quicker . In this method not only the first but every subsequent deep opened is 60 curium ( 2 ft ) in width . The topsoil and the second saliva of soil are carry away from the first oceanic abyss and kept on an individual basis at the far end of the plot . The base or third spittle is then forked and ruin up . The first spitting from the 2nd trench is then taken to the other final stage of the plot and left apart from the heavy heap of grease from the third oceanic abyss .
The second saliva of the 2d deep is thrown onto the separate undersoil and the infrastructure of the second deep is forked to break it up . The top spit of the third oceanic abyss is choose in good order over to the top of the first trench ; the 2d spit of the third trench is reverse over onto the forked surface at the bottom of the second trench and the base of the third deep is break away up . Thus the shape is repeated until at the far end of the plot of land the next to last trench has one of the hatful of surface soil put on to it and the last trench has the 2d saliva stilt put in on top of the broken up base of the trench and the top spitting soil put on the top .
deeply trenchingis a magnetic variation of full trenching in which the undersoil is brought on top of topsoil but this practice is drastic and could be disastrous .
Ridging
As an alternative on heavy land to ordinary digging , where the Earth’s surface is left level , the soil can be thrown up in ridges and furrow resembling plowed solid ground in a method have a go at it as ridging , in which a groovy surface of the soil is disclose to the action of the weather .
The plot to be dug is divided into 90 cm ( 3 ft ) striptease flow across it , starting at one corner of the plot . At one end of the first landing strip take out soil to a deepness of 25 cm ( 10 in ) ( one spade ’s deepness ) and two spade widths and take the grease in a wheelbarrow to the other final stage of the funnies . Then working back stand on the soil and dig three spadesful of soil side by side throwing each forward onto the space from which surface soil has been take .
The right - hand spadeful goes forwards and slenderly towards the center , the next spadeful to the left and slightly towards the center and the third spadeful pass away on top of these two . stride back and repeat the process and a ridge of filth will be made the length of the strip , the hollow at the end being filled in with the grunge taken and set aside from the first of the striptease . preserve digging in this way forming parallel ridges until the whole area has been dug .